Solar Damper,Lithium battery,Solar tracker actuator,Solar Tracking Controller,NMRV Series Worm Gear Reducer,Planetary gear motor, The new ground has strategic value for Frontier’s long-term goal of producing more than 500 megawatts solar energy to power its green hydrogen strategy.
It will be included in a hydrogen expansion study being completed by consultant Xodus Group which is on track to be released next month.
Preliminary results from the study indicate Frontier could be producing fuel “significantly earlier” than anticipated at Bristol Springs.
Solar Damper,Lithium battery,Solar tracker actuator,Solar Tracking Controller,NMRV Series Worm Gear Reducer,Planetary gear motor, Frontier is reviewing a numbe r of funding options, including sale and leaseback arrangements whereby a property fund could acquire the land options.
Frontier would then enter into a long-term lease with the property fund (on standard commercial terms for comparable properties) with an option to acquire the property, as well as debt and equity funding structures.
The company said a number of property funds have expressed interest in acquiring the land.
Frontier said there had been a “notable shift” in long-term demand for renewable energy in WA and across the rest of the country.
The demand is believed to be driven by government policy and proposed changes to legislation, which support the company expanding its landholding around Bristol Springs.Solar Damper,Lithium battery,Solar tracker actuator,Solar Tracking Controller,NMRV Series Worm Gear Reducer,Planetary gear motor,
The changes include the government’s announcement in May that it would explore the implementation of a renewable hydrogen target to support growth of the renewable hydrogen industry.Solar Damper,Lithium battery,Solar tracker actuator,Solar Tracking Controller,NMRV Series Worm Gear Reducer,Planetary gear motor,
More recently, the government said it would close the state’s last remaining coal-fired power operation near Collie by the end of the decade.
The 340Mw Collie plant will cease operations by the end of 2027, while the 854MW Muja power station units will shut down by 2029.
The government said it planned to invest an estimated $3.8 billion in new green power infrastructure around WA.
In June, Frontier disposed of shares held in Athena Resources (ASX: AHN), realising $250,000 in proceeds which are being used to fund the option fee payments.Solar Damper,Lithium battery,Solar tracker actuator,Solar Tracking Controller,NMRV Series Worm Gear Reducer,Planetary gear motor,